| Client : Sabah Electricity Board | |||
|
The project consists of 200 km of 275kV overhead transmission line sections connecting the substations at Sime-Darby, Damroad and Kalumpang and 120 km of 132kV overhead transmission line sections connecting the substations at Sandakan, Lahad Datu, Semporna and Tawau in the state of Sabah in East Malaysia.
|
|
||
Distribution projects undertaken by the Company include:
Genting Highlands Bhd 11kV distribution development involving a number of switching stations and distributions, 33kV overhead lines and 11kV cable distribution network at between 1000-2000 meters above mean sea level.
LLN Central Kedah Valley development involving 200km of 33kV single circuit overhead lines and seven 33/11kV main-intake substations.
LLS 33kV Sandakan network - Phase I involving construction of 33kV Batu Sapi Power Station, double circuit 33kV lattice tower line to Mile 4 Substation and Mile 4 33/11kV Substation
LLS Tanjung Aru Power Station Augmentation
TNB Pulau Langkawi 33/11kV Main Intake substation
TNB Ayer Hiyam 33/11kV Main Intake Substation
TNB Simpang Empat 33/11kV Main Intake Substation
TNB MAS 33/11kV Main Intake Substation
The K L International Airport 33kV, 11kV and 415V Electrical Reticulation involving more than 50 substations and 500km of 33kV & 11kV Cables
KTA Tenaga was appointed to carry out the planning of electrical and telephone infrastructure services for the following projects:
33kV supply to Selayang Jaya Housing Scheme in Selayang, Selangor for Selayang Jaya Sdn Bhd
HT electrical power intake and HT electrical reticulation within the Langkawi Resort Complex on Langkawi Island for Promet Consultancy Sdn Bhd
Electric and telephone infrastructure planning for the 1450 acres Kepong Estate (Township Development) Selangor for Multi-Purpose Bersatu Development
Electric and telephone infrastructure planning for the 45 acres residential and industrial development, Petaling District, Selangor for Tasisas Sdn Bhd
Preliminary study of electricity, telephone, street lighting and water requirements for the proposed Mukim Kapar Industrial Park, Kapar, Selangor
Master plan study for electricity, telephone and lighting services for the proposed Pulau Lumut Development for Central Spectrum Sdn Bhd
Kelana Jaya Township Development for Mastri Padu Sdn Bhd
Infrastructure master planning for Danau Kota Development at Setapak, Kuala Lumpur
Coastal Village, Environmental Improvement Project for Ministry of Rural Development
Preliminary planning of electricity, telephone, street lighting requirements for the proposed Johor Tenggara Industrial Estate, Johor
Infrastructure master plan for electricity, telephone, water, drainage and sewerage requirements for the proposed Karambunai Gold Resort in Sabah
Infrastructure planning for Office Park Development, Subang for Peremba Development Sdn Bhd
Electrical system for the utilities infrastructure of new Township development of Sungei Buloh in Kuala Lumpur. The township is located on a 640 acres site and the power distribution required 14 substations and 33kV cable networks.
New Township of Permas Jaya which is located on 1,440 acres near the hinterland of Pasir Gudang New Port in Johore. For power distribution 9 substations were built and power is distributed though 33kV cable networks.
Recreational, Industrial and Housing Development at Serendah. The power distribution for this development required electricity distribution via 10 substations and 33kV cable networks.
Industrial and Housing Development in Mukim of Damansara for Sime UEP. In this development, the power is distributed via 12 substations and 33kV cable networks.
Pulau Indah Industrial Park Development, Selangor
Desaru Development, Johore