Power System Studies

Techno-Economic System Expansion, Privatisation and Corporatisation Studies

Techno-Economic System Expansion Studies

Some of the selected system expansion and economic studies successfully completed are:

  • Lembaga Letrik Sabah (LLS) - Sabah Power Development Master Plan Study to Year 2000

  • Arthur D. Little - Energy Study for Industrial Development in Sabah and Sarawak for Economic Planning Unit (EPU)/Sarawak Electric Supply Corporation (SECSO)/Sabah Energy Commission (SEC).

  • SECSO System Reliability Study for Kuching area.

Read more...

 

Transmission System Studies, Electrical Distribution System and Planning Studies

Transmission System Studies and Project Implementation

KTA Tenaga undertook various studies on different transmission systems which includes:

  • Vector group standardization of all Lembaga Letrik Sabah (LLS) major power transformers.

  • Labuan Beaufort Interconnection Sdn Bhd; Sabah Gas Industries Power Plant - LLS Beaufort Substation 132kV double interconnection study to determine its performance and effects on LLS system.

  • Sabah East Cost 275/132kV Transmission Grid System and Liwagu Hydro Electric Power Plant 275kV Interconnection studies.

Read more...