Industrial Buildings, Process Plants

Silverstone Tyre & Rubber Factory Phase 1 and 2

Client : Silverstone Tyre & Rubber Co. Sdn. Bhd.

The plant occupies an area of about 30 acres. The other works comprised raw material and finished goods warehouses, Banbury platforms, main processing factory, basements and trenches for tyre presses, raw rubber store, cement house, Resiliometer plant, canteen, administration office block, tyre training centre, humidity control plants and club house.

Services Provided: Soil investigation, architectural works, detailed engineering design for civil and structural works, quantity survey, contract documentation, tender evaluation, contract administration, construction supervision, industrial process services and mechanical & electrical services


 

MTBE/Propylene Plant in Gebeng, Kuantan

Client : Pilecon Engineering Berhad / Mitsubishi Heavy Industry Ltd.
The plant occupies three sites, namely, Plant Site (128 acres), Port Storage Site (16 acres) and Jetty Site, which consists of :
  • Non-process buildings including 2-storey administration building (7,000m2), workshop & warehouse building (5,300m2), blast proof control building

  • Petrochemical process structures including heavy foundations for major tanks, catalyst cracking reactor structures, heat exchanger vessels, etc. and steel and r.c. structures for large span multi-storey pipe racks, piping and equipment platforms, sleepers and associated works

  • 132kV main intake substation.

Services Provided: Soil investigation, architectural works, detailed engineering design for civil, structural, mechanical and electrical services including site construction supervision.


 

Modenas Factory in Gurun, Kedah

Client : Immatex Bhd

The project which is located in Gurun, Kedah has three main manufacturing and assembly buildings with a total built-up area of about 700,000 sq. ft.  Block A houses the manufacturing section of motorcycle body parts i.e. cutting, pressing and welding section and also electroplating and oven baked spray painting section.  Block B houses the engine parts machining and manufacturing section and the engine assembly section whilst Block C houses the final assembly line of motorcycles and inspection before they are ready for delivery.

Services Provided: Mechanical and electrical engineering consultancy services for Electrical Power and Lighting Services, Boiler and Steam Piping System, Compressed Air System, Fire Fighting Services, LPG Reticulation System, Sanitary and Waste Water Plumbing.


 

Gas Processing Plant Extension Project (GPP II & III)

Client : Petronas Gas Sdn Bhd
The second and third stages of the Gas Processing Plant, GPP II & III, and expansion project for Petronas Gas Sdn Bhd in Kertih, Terengganu, had been planned to produce a base load fuel gas supply to the main consumers with a maximum sales gas production capacity of 7.0 million standard cubic metres per day (250MMSCFD).   The addition of the two trains increases the total GPP capacity to 21 million standard cubic metres per day(750MMSCFD). The other products of ethane, propane and butane gas will be exported or used by downstream petrochemical plants.

The plant design includes facilities such as feed pretreatment, acid gas removal unit, dehydration unit, cascade refrigeration, demethanizer and deethanizer, product recovery unit, compression facilities, storage and other off-site utilities. The scope also includes the expansion, which comprised mainly engineering work for refrigeration facilities and utilities to receive increased volume of propane and butane from the plant.

Services Provided: Project Management, Design Concept and Planning, Basic Design and Engineering, Preparation of Technical Specifications, Schedules and Drawings, Preparation and Evaluation of Tenders, Contract Management, Construction Supervision, Quality Assurance, Inspection and Testing, Supervision of Commissioning, Start-Up and Handling-Over, Training and Technology Transfer.


 

Centralised Utility Facilities Project at Kerteh and Gebeng and Ammonia Syngas Plant at Kerteh

Client : Foster Wheeler (M) Sdn Bhd
The Centralised Utility Facilities (CUF) project is a centrally located facility that supplies a range of utility requirements for future integrated petrochemical complex in Kerteh and Gebeng.  The utilities like electricity, demineralised water and gases will be supplied to the nearby aromatic, ethylene derivative and ammonia syngas plants.

The Ammonia Syngas Plant is built adjacent to the CUF.  The plant is expected to produce 700 metric tonnes carbon monoxide a day, 204 metric tonnes oxogas a day and 1350 metric tonnes ammonia a day.

Services Provided: Project management and project control entailing Civil, Architecture, Structure, Building Services, Instrumentation, Electrical and Piping.  Additional services include liaison with local authorities, expediting services for submission and approval of application to the various Regulatory Agencies.


 