Environmental Management, EIA Study

Environmental Management Guide

KTA Tenaga has experience in preparing Environmental Management Plan (EMP) and Guide. 

Perbadanan Putrajaya: Environmental Management Guide for Putrajaya

Environmental Management Guide for Putrajaya is to facilitate compliance of the environmental requirements of Perbadanan Putrajaya by all the project proponents in Putrajaya. The Guide, developed based on ISO 14001 EMS, explains the administrative system of Perbadanan Putrajaya, highlights the environmental legislation, guidelines and requirements and provides the procedures for compliance. The Guide also resulted in two associated reports; i.e. Putrajaya Lake Management Guide and Review of Environmental Legislation.

Read more...

 

Latex Water Treatment Plant

Client : EAC Rubber Industries (M) Sdn bhd

The project involves a latex waste treatment plant for a rubber glove manufacturing plant. Factory effluent of nearly 240 cu.m/day required removal of BOD, COD, SS, Zinc, Oil and Grease.

Services Provided: Investigation and Study, Design, Construction Supervision and Commissioning.


 

Wastewater Treatment

KTA Tenaga has particular expertise in domestic and industrial waste treatment with respect to feasibility studies, investigation of treatment options, design and implementation of treatment plants. The types of industries serviced by the Company include:

- Rubber goods - Chemical
- Metal products - Palm oil
- Motor vehicle assembers, etc. - Food processing

Read more...

 

Environmental and Risk Assessment

Environmental Impact Assessment studies conducted are in the areas of integrated urban development, highways, power stations, chemical and petrochemical plants, flood mitigation, dam construction and quarry operations.

Read more...

 

Study National Register of River Basins - phase 1 & 2

Client : Department of Irrigation and Drainage, Malaysia

Project Objectives.

  • To develop the River Register for whole the country;
  • To develop and implement the operational RB-IMS for the four river basins complete with the RB-IMS Information Updating System for the DID;
  • To develop the river register and the river related GIS layers associated with the DID functions for the four river basins (as stated above);
  • To formulate the Implementation Master Plan of the RB-IMS for the whole country.
Services Provided:
  • Collect, process and compile the required information from the RB-IMS institutional stakeholder agencies associated with the four river basins, and populate, test and refine the draft RB-IMS framework ;
  • Develop, test and refine the RB-IMS Thematic Databases in the draft RB-IMS framework and populate the same with the required information for the four river basins which includes the national-type information ;
  • Develop and implement the RB-IMS Information Updating System for the DID.